HE Simms Success Continues
HE Simms Success Continues
06 December 2011
In what are tough times in this current economic market HE Simm have secured a further £7m of projects in the last 6 weeks, successes include Phase 2 of a 332 bed student accommadation scheme in Newcastle, and a 568 bed student scheme in Leeds for Downing Construction.
Further successes came with new clients for HE Simm, a 124 bed Ramada Encore at Luton Airport with Multibuild, and a 515 bed student accommadation in Manchester with Marcus Worthingtons.
All of the above schemes are design and build.
Gareth Simm Managing Director commented, this is all an excellent contribution to our increased turnover target.
Back